- Mon - Sun: 24/7 online service for you

SUBBASE AND BASE COURSE Item 200 - Aggregate Sub - base course Tests: For every 300 cm or fraction thereof : 1 - G, Grading Tests 1 - P, Plasticity Test (LL, PL, PI) For every 1500 cm or fraction thereof: 1 - C, Laboratory Compaction Test For every 2500 cm or fraction thereof: 1 - CBR, California Bearing Ratio Test For every layer of 150 mm of compacted depth/based on the results ...
WhatsApp:+8617329420102
density of at least 100 percent of the maximum dry density determined in accordance with AASHTO T 180, Method D has been achieved. In-place density determination shall be made in accordance with AASHTO T 191. f Method of Measurement - Aggregate Base Course will be measured by the cubic meter (m3). The quantity to be paid for shall
WhatsApp:+8617329420102
Crushed Aggregate Base Course . 1. Description. Construct a foundation course for a surface course or for other base courses, composed of crushed aggregate materials as described in this specification, in one or more courses, in conformity with the typical sections shown on the plans, and to the lines and grades as established by the Engineer. 2.
WhatsApp:+8617329420102
209-1.3 This item consists of a base course composed of crushed aggregate base constructed on a prepared course in accordance with these specifications and in conformity to the dimensions and typical cross-sections shown on the plans. 209-2 MATERIALS 209-2.3 Crushed aggregate base. Crushed aggregate shall consist of clean,
WhatsApp:+8617329420102
2. Crushed aggregate base coarse (Compaction Gravel) shall be purchased per standard ton with a standard ton to weight 2,000 pounds for the purpose of this contract. Material shall be ordered in full truck load lots. 3. Contractor shall proceed with delivery of crushed aggregate base coarse (Compaction Gravel) upon 12 hour notice. 4.
WhatsApp:+8617329420102
Crushed aggregate base course shall be accepted for density and thickness on an area basis. Two tests shall be made for density and thickness for each 1200 square yards. Sampling locations will be determined on a random basis according to ATM SP 4. 5/22 P-209-4 a. Density. The Engineer will perform all density tests.
WhatsApp:+8617329420102
Effective with the November 2021 Letting 2022 Standard Specifications [3] Required as specified for the individual component materials defined in columns 2 - 6 of the table before blending. [4] For base placed between old and new pavements, use crushed stone, crushed gravel, or crushed concrete with a plasticity index of 3 or less. [5] >=75 percent by count of non-asphalt coated particles.
WhatsApp:+8617329420102
Aggregate base course construction, except as noted in the Standard Specifications, requires that a certain density be achieved. In order that this density can be checked in the field, a sample must be submitted to the Laboratory for standard maximum density determination. The contractor is also required to determine the compaction standard.
WhatsApp:+8617329420102
Aggregate base course shall be accepted for density on a lot basis. A lot will consist of one day's production where it is not expected to exceed 2400 square yards. ... 209-4.1 The quantity of crushed aggregate base course to be paid for will be determined by measurement of the number of square yards of material actually constructed and ...
WhatsApp:+8617329420102
Crushed aggregate base coarse (Compaction Gravel) shall be purchased per standard ton with a standard ton to weight 2,000 pounds for the purpose of this contract. Material shall be ordered in full truck load lots. 3. Contractor shall proceed with delivery of crushed aggregate base coarse (Compaction Gravel) upon 12 hour notice. 4.
WhatsApp:+8617329420102
Apr 22, 2022Sub-base for driveways, roads, or highway works needing better stability. Crushed Stone #3: Approx 1″-2½ ″ Wide. Crushed rocks number 3 grade is one of the most popular sizes for homeowners as it can be used for numerous construction projects as a solid foundation. Stones range from 1 inch to 2½ inches in diameter and typical applications ...
WhatsApp:+8617329420102
Trus is essential because for a base course to perform properly it must be compacted to a high density which is determined by laboratory tests and is obtained on the job by rolling. Tbe required density cannot be obtained by rolling on a soft, yielding or elastic foundation. The foundation must be £rm and solid.
WhatsApp:+8617329420102
It is shown that maximum dry density of crushed stone, both in the laboratory and during field compaction, is achieved when the material is in a near saturated condition and that the workability of the material is the restricting factor. ... TRT Terms: Base course (Pavements); Coarse aggregates; Compaction; Crushed rock; Density; Dry density ...
WhatsApp:+8617329420102
21 1043-2 AGGREGATE BASE COURSE 22 The material shall meet the ABC gradation. The LL of the material shall be raised 5 points to 23 no more than 35. 24 1043-3 AGGREGATE SHOULDER BORROW 25 The material shall meet Section 1019. 26 1043-4 CLEAN COARSE AGGREGATE FOR ASPHALT 27 The material shall meet the gradation of a standard size in Table 1005-1.
WhatsApp:+8617329420102
1 cubic yard weighs approx. 2,800 lbs or 1.4 tons. Aggregate, Sand, Gravel, Rock [MSDS] Aggregate Gradation Averages Product Number Size Estimated Weight Available at the Sales Counter/ Warehouse: 132 060Q 1/4 cubic yard 700 lbs 132 060H 1/2 cubic yard 1,400 lbs 132 060T 3/4 cubic yard 2,100 lbs 132 060Y 1 cubic yard 2,800 lbs Available at the Klatt Pit Scale House: 132 060 bulk ton 2,000 lbs ...
WhatsApp:+8617329420102
Min 4 weeks should be allowed for this sampling (305.02) Washington Yes up to 100% as base (9-03.21) Wisconsin >= 90% crushed concrete that is free of steel reinforcement. And include <10% asphaltic pavement or surfacing, base or a combination of asphaltic pavement, surfacing and base (301.2.3.2)23 Celeen (2007)
WhatsApp:+8617329420102
Then, click on either Base Rock, Drain Rock, or a Custom Density material selection. The Base Rock and Drain Rock selections will supply a default density of the rock; the Custom selection requires an entry for rock density in the Density field. Finally, click on the Calculate button. The calculated number of tons of aggregate will be returned.
WhatsApp:+8617329420102
9.31 ROAD BASE GRAVEL COURSE Road Base shall be of uniform quality, crushed to size as necessary and shall consist of sound, tough, durable, highly angular, 100% mechanically crushed fragments. A minimum of 50% of the particles retained on the 4.75 mm (No. 4) sieve shall have at least one fractured face as determined by particle count.
WhatsApp:+8617329420102
200-6.1.2 Multiple Course Base: Clean the first course of foreign material, then blade and bring it to a surface cross-section approximately parallel to the finished base. Before spreading any material for the upper courses, allow the Engineer to make density tests for the lower courses to determine that the required compaction has been obtained.
WhatsApp:+8617329420102
201797testing. Source of aggregates density and porosity water absorption of A1 and A2 coarse aggregates were kept constant. From lab testing it was found that the density of fine aggregates impact crushed A1 coarse aggregates and vertically shafted A2 coarse aggregates were 2.79 gcm 3 2.70 gcm and 2.70 gcm3 respectively. Water.
WhatsApp:+8617329420102
6-1 After mixing and shaping, each layer shall be compacted within twenty percent (20%) of its optimum moisture conte nt. The density of each layer of base aggregate m aterial, when com pared to the theoretical m axim um density as determined in accordance with VTM-1 shall conform to the following:
WhatsApp:+8617329420102
The relative density is a ratio that describes the density of the aggregate relative to the density of water. A typical range for natural coarse aggregate is 2.4 to 2.9, meaning that the coarse ...
WhatsApp:+8617329420102
Crushed Aggregate Base Calculator LoginAsk is here to help you access Crushed Aggregate Base Calculator quickly and handle each specific case you encounter. Furthermore, you can find the "Troubleshooting Login Issues" section which can answer your unresolved problems and equip you with a lot of relevant information.
WhatsApp:+8617329420102
weight of rollers to compact the material to the required density. Compact the aggregate base course in-place to a field target density of at least 100 percent and a lower specification limit (L) of at least 97.0 percent of the maximum density of laboratory specimens prepared from samples of base course material delivered to the job site.
WhatsApp:+8617329420102
the ASTM Method D 2049 (Relative Density), the Washington Spring-Loaded Vibratory Compactor Method, the Marshall Hammer Test, and the Gyratory Compactor Procedure. The aggregates tested were a granite-gneiss, a crushed gravel, a dolomitic limestone, and a basalt. A prototype field compaction 'testing program was conducted using the same
WhatsApp:+8617329420102
The California Department of Transportation (Caltrans) provides specifications for the use of recycled aggregate, sometimes referred to as crushed miscellaneous base (CMB), as base (section 26) or subbase (section 25) on road projects.This Department of Resources Recycling and Recovery (CalRecycle) webpage is a selective list of Caltrans specifications for the use of recycled aggregate ...
WhatsApp:+8617329420102
Do not use crushed concrete coarse aggregate in the following: mainline pavements or ramps with a commercial ADT greater than or equal to 250, concrete base course, bridges, box or slab culverts, headwalls, retaining walls, pre-stressed concrete, or other heavily reinforced concrete. Avoid contamination with non-concrete materials, including ...
WhatsApp:+8617329420102
Aggregate Base (AB) is typically made of a recipe of mixing different sizes of crushed rock together forming the aggregate which has certain desirable properties.20 mm or 3/4 inch Aggregate Base, Class 2, is used in roadways and is an aggregate made of a specific recipe of different sizes and quality of rock inclusive of 20 mm ...
WhatsApp:+8617329420102
1.5.2.3 Moisture-Density Determinations 1.5.2.4 Field Density Tests 1.5.2.5 Wear Test 1.5.2.6 Flat and Elongated Pieces 1.5.2.7 Soundness 1.5.2.8 Fractured Faces ... [AGGREGATE BASE COURSE] [AND/OR][GRADED CRUSHED AGGREGATE BASE COURSE] FOR FLEXIBLE PAVING 05/22 ***** NOTE: This guide specification covers the requirements for base course to be ...
WhatsApp:+8617329420102
E. Compacted Base Course For every layer of 150 mm compacted depth . 1-D, Field density Test for every 150m or fraction thereof 1-T, thickness determination for every 150 m or fraction thereof Item 205 - Asphalt Stabilized Road Mix Base Course Amount of Asphalt to be added: 6 to 10 mass % of dry soil aggregate. A. Soil Aggregate
WhatsApp:+8617329420102
Dense-graded base course refers to crushed stone aggregates with a range of particle sizes, usually 1-1/2-inch and smaller, that produce a dense layer of stone with a minimum amount of voids. Common uses for base coarse crushed stone • Foundation for asphalt pavement • Foundation for concrete pads and pavements • Unpaved roads and shoulders
WhatsApp:+8617329420102
Because it is a foot thick, that's 12000 ft³ or 444.5 yd³. Weight in tons will depend on the density of the crushed stone used. It can vary. I'm guessing 1.3 - 1.4 US tons per cubic yard, but some materials could be outside that range. Say 600 tons, more or less. Flag Unregistered Share Tweet #3 06-06-2012, 07:22 AM
WhatsApp:+8617329420102
Crushed Aggregate Base Course ... clean, sound, durable particles of crushed stone, crushed gravel, ... furnace slag and shall have a unit weight of not ... This layer is placed over an open-graded base (typically No. 57 stone) and sub ... open-graded crushed stone base with ... Density and Unit Weight of Soils ... Earthwork/grading engineering ...
WhatsApp:+8617329420102
Coe MOGS-02233. Graded-crushed-aggregate base course. active, Most Current.Details. Graded-crushed-aggregate base course.A description is not available for this item. Search: Crushed Asphalt. Recycled asphalt millings is the perfect base for a future asphalt or paving job, but it also provides a quality look and durable finish for your driveway - with a budget friendly solution Call Area ...
WhatsApp:+8617329420102
If aggregate base will be paid for by weight, obtain the optimum moisture content from the aggregate base moisture-density compaction curve and sufficient moisture samples to determine pay quantity adjustments. Ensure that the aggregate base is spread on the subgrade without significant segregation.
WhatsApp:+8617329420102
ITEM 304 AGGREGATE BASE COURSE Compaction of unbound bases is important for the stability of the pavement it supports. The maximum dry density is established in the laboratory before construction. During construction measurements of the base dry density are compared to the maximum dry density. The requirements for compaction of
WhatsApp:+8617329420102
The approximate bulk density of aggregate that is commonly used in normal-weight concrete is between 1200-1750 kg/m3 (75-110 lb/ft3). Here, the Standard test method for determining the bulk density of aggregates is given in ASTM C 29 (AASHTO T 19). Relative Density of Aggregate See more result ››
WhatsApp:+8617329420102
Key Features: Most aggregates have a relative density between 2.4-2.9 with a corresponding particle (mass) density of 2400-2900 kg/m3 (150-181 lb/ft3). Here, for coarse aggregates, the standard test method has been explained in ASTM C 127 (AASHTO) and for fine aggregates, the standard test method has been explained in ASTM C 128 (AASHTO). [3]
WhatsApp:+8617329420102
1 ton 10mm aggregate to cubic meter :-10mm aggregate or stone chips is categories as fine aggregate, dry density of 10mm aggregate = 1680 kg/m3, it means 1m3 of 10mm aggregate weight is 1680kg or 1.6ton, 1 ton = 1000kg, 1 ton 10mm aggregate or stone chips to cubic meter = 1000/1680 = 0.5950 m3,so 1 ton 10mm aggregate is equal to 0.5950 m3 ...
WhatsApp:+8617329420102
Materials for gravel surface course and crushed aggregate surface course shall have a soaked CBR value of not less than 80% as determined by AASHTO T 193. The CBR value shall be obtained at the maximum dry density and determined by AASHTO T 180, Method D. 300.3 Construction Requirements. ... Aggregate Base Course.
WhatsApp:+8617329420102